Many people want a lift in their home or building but don’t know how installation actually works. How long does it take? What civil work is needed? What should you do before the team arrives? This blog explains the full process of top lift installation in Chennai in simple steps.
Step 1: Enquiry and Consultation
It all starts with a call or message. You share basic details – building type, number of floors and what you need the lift for. The team explains the lift options that suit you, like home lifts, hydraulic elevators or MRL elevators.
Step 2: Site Visit and Measurement
A trained person visits your site and checks:
- Space for the lift shaft
- Pit depth (the space below the lowest floor)
- Headroom (the space above the top floor)
- Power supply
Path to bring in materials
Step 3: Lift Selection and Quote
Based on the site visit, the right lift is suggested. You choose the cabin design, door type and finish. Then you get a clear written quote with all costs.
Step 4: Drawing and Civil Work
You receive a lift drawing with exact shaft and pit sizes. Your builder or contractor prepares:
- The lift pit
- The shaft walls
- Door openings on each floor
- Hooks for lifting heavy parts
- Power point for the lift
Tip: Follow the drawing exactly. Small mistakes here can delay installation.
Step 5: Material Delivery
Once civil work is ready, lift materials reach your site – guide rails, motor, controller, door frames, cabin parts and wiring. Keep a safe, dry place to store them.
Step 6: Installation
The installation team then:
- Marks the shaft and fixes the rail brackets
- Fixes the guide rails in perfect alignment
- Installs the motor or hydraulic unit
- Assembles the cabin
- Fixes landing doors on each floor
- Completes wiring and controller setup
Fixes safety devices – safety gear, governor, sensors, ARD
Step 7: Testing
This is the most important step. The lift is tested for:
- Smooth start and stop
- Exact floor levelling
- Door opening and closing
- Overload alarm
- Emergency alarm and intercom
- Power-cut rescue with ARD
Brakes and safety gear
Step 8: Handover and Training
The team shows you how to use the lift and what to do in an emergency. You receive warranty and service details.
Step 9: Regular Maintenance
After handover, regular service and maintenance keeps the lift safe and smooth for years.
How Long Does Installation Take?
The time depends on lift type, number of floors and how ready the civil work is. A home lift in a ready shaft usually takes less time than a multi-floor passenger lift. Your installation team will give you a clear timeline after the site visit.
Tips for a Smooth Installation
- Plan the lift early if you are building a new house
- Finish civil work as per the drawing
- Keep power supply ready
- Keep the site clear for the team
Don’t use the lift before final testing and handover
What Affects Installation Time?
- Lift type: Home lifts are usually quicker than large passenger lifts.
- Number of floors: More floors mean more rails, doors and wiring.
- Civil work readiness: If the pit and shaft are not ready, work cannot start.
- Power supply: Testing needs a proper power connection.
- Site access: A clear path for materials saves time.
Custom design: Special cabins or glass work may need more time.
Safety During Installation
During installation, the shaft is an active work area. Keep children and family members away from the shaft and landing door openings. The installation team should use barricades and safety signs on every floor until the doors are fixed.
Replacing an Old Lift?
If your building has an old lift that breaks down often, you can either replace it fully or upgrade key parts. Learn more about lift modifications.
Why Choose Victory Lifts for Installation?
Victory Lifts is a Chennai-based lift company with trained installation teams. They handle installation for homes, villas, apartments, hospitals and commercial buildings across Chennai, Coimbatore, Madurai, Trichy and other Tamil Nadu cities. Many customers also choose them as the best lift company in Chennai.